General Electric Power & Water
Westborough, MA

The Challenge

Design and bid air quality improvements (Formic Acid Scrubber) within a compressed schedule and budget constraints.

The Solution

Working with the plant manager, CSL Consulting led the construction project team and implemented communication and schedule and reporting protocols. We guided the design and construction teams through the equipment selection and coordination of design into ongoing and future production requirements. We challenged the teams by including third party peer reviews to select equipment, materials and a design that worked within the tight project schedule and budget.

The Key Benefits

Through value engineering, quality assurance and design recommendations, CSL saved the client over 20% on their construction costs, while meeting the project’s design guidelines, schedule and operational requirements.